UOʻK 622.274.4 KOVULDI OLTIN KONI UCHUN TEZ QOTUVCHI MONOLIT TO‘LG‘AZMA MATERIALLARNI TAYYORLASH METODIKASI

Mislibayev, I.T., Alimov, Sh.M.

Ilim ha’m ja’miyet · 2024-yil

Annotatsiya

The article discusses the development system used at the Kovuldi gold mine, owned by the Almalyk Mining and Metallurgical Combine joint-stock company, i.e. backfilling of mined-out space using a methodology for selecting the composition of backfill materials during backfill mining operations and the possibility of technical application were considered.

Maqola ma’lumotlari
MualliflarMislibayev, I.T., Alimov, Sh.M.
JurnalIlim ha’m ja’miyet
Nashr sanasi2024-04-26
Son2-1
Betlar18-21
Tiluz_Latn

Kalit so‘zlar

monolit to‘lg‘azma, qizil qum, fraksiya o‘lchamlari, transportabellik (kameragacha yetkazib kelish), kamera, qazib olish tizimi, sement, marmar qumi, монолитная закладка, красный песок, размеры фракций, транспортабельность (доставка в камеру), камера, система разработки, цемент, мраморный песок, monolithic backfill, red sand, fraction sizes, transportability (delivery to the chamber), chamber, development system, cement, marble sand

Ilmiy soha

Ilim ha’m ja’miyet jurnalidan boshqa maqolalar

Ilim ha’m ja’miyet — barcha maqolalar