Relevance: With the intensive integration of renewable energy sources into electric power systems, the well-founded selection of the connection node and power rating of battery energy storage systems (BESS) is becoming increasingly important for ensuring their effective deployment. Comprehensive consideration of seasonal and loading conditions of the power system, active and reactive power exchange, as well as post-contingency states under the N–1 criterion, makes it possible to improve the reliability and robustness of BESS parameter selection. Aim: Determination of the optimal BESS connection node and power conversion system (PCS) rating in the northwestern part of the Uzbekistan power system based on robust multi-criteria assessment, considering various seasonal and loading conditions, active and reactive power control capabilities, and the N–1 criterion. Methods: The study employed multi-operating-condition simulation based on two actual seasonal operating conditions and three load levels, bidirectional BESS active power exchange, reactive power control, multi-criteria assessment, and combinatorial analysis of criterion weighting factors. A total of 44 nodes were evaluated using a model of the northwestern part of the Uzbekistan power system. The robustness of the selected solution was verified by simulating 47 common contingencies under the N–1 criterion. Results: According to the multi-criteria assessment results, the Xorezm ORU-110 node, with a robustness score of 0,677, was identified as the most preferred BESS connection point. This node ranked first in 77,3% of the 66 combinations of criterion weights and maintained its leading position under critical N–1 contingencies. For the 47 common contingencies, a total of 1,692 successfully converged calculations were performed. The results showed that the minimum acceptable PCS active power rating was 70 MW, with an apparent power rating of 84 MVA and an available reactive power capability of 46,43 Mvar at rated active power.
| Mualliflar | Tokhir F. Makhmudov, Adkham N. Ramatov |
|---|---|
| Jurnal | Энергия ва ресурс тежаш муаммолари |
| Nashriyot | «Ўзбекэнерго» АО, ТДТУ, Ўзбекистон Республикаси ФА, Энергия ва ресурслар тежаш илмий-амалий ўқув маркази, «Ўздавэнергоназорат» давлат инспекцияси, «Энергия тежамкорлиги ва қайта тикланувчи энергия манбалари» илмий-тадқиқот лабораторияси |
| ISSN | 2091-5985, 2181-1946 |
| Nashr sanasi | 2026-10-13 |
| Son | 3 |
| Betlar | 102-111 |
| Til | Ingliz |
| Indeksga qo‘shilgan | 2026-10-22 |
BESS, BESS, BESS
| APA | Tokhir F. Makhmudov, & Adkham N. Ramatov (2026). Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System. Энергия ва ресурс тежаш муаммолари, (3), 102-111. https://energy.tdtu.uz/index.php/journal/article/view/416 |
|---|---|
| GOST (OAK) | Tokhir F. Makhmudov, Adkham N. Ramatov Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System // Энергия ва ресурс тежаш муаммолари. – 2026. – № 3. – P. 102-111. |
| MLA | Tokhir F. Makhmudov, and Adkham N. Ramatov. “Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System.” Энергия ва ресурс тежаш муаммолари, (3), 102-111, 2026. https://energy.tdtu.uz/index.php/journal/article/view/416 |
| Chicago | Tokhir F. Makhmudov, and Adkham N. Ramatov. “Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System.” Энергия ва ресурс тежаш муаммолари, (3), 102-111 (2026). https://energy.tdtu.uz/index.php/journal/article/view/416 |
| Harvard | Tokhir F. Makhmudov, and Adkham N. Ramatov (2026) ‘Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System’, Энергия ва ресурс тежаш муаммолари, (3), 102-111. https://energy.tdtu.uz/index.php/journal/article/view/416 |
| BibTeX | @article{tokhirfmakhmudov2026,
title = {Robust Multi-Criteria Selection of the BESS Connec-tion Node and Power Rating in the Northwestern Part of the Uzbekistan Power System},
author = {Tokhir F. Makhmudov and Adkham N. Ramatov},
journal = {Энергия ва ресурс тежаш муаммолари},
year = {2026},
number = {3},
pages = {102-111},
url = {https://energy.tdtu.uz/index.php/journal/article/view/416}
} |
Boshqa maqola uchun iqtibos tayyorlash
Relevance: in recent years, as a result of the widespread introduction of renewable energy sources in electric power systems, the increase in the number of consumers, and the uneven distribution of electrical loads…
Relevance: the growing penetration of distributed photovoltaic systems increases the need to coordinate variable solar generation with local demand. Short-term irradiance variations cause rapid changes in grid import…
Relevance: the use of thermal energy storage devices based on renewable energy sources in buildings serves to partially or fully cover energy demand, achieve energy efficiency, reduce the overload on traditional energy…
Relevance: at present, the scale of environmental damage caused by the flow of industrial and household waste into the environment is steadily increasing. At the same time, reserves of conventional natural fuel…
Relevance: designing and modernising urban power supply systems requires reliable values of design loads. Such values cannot be obtained by theoretical modelling alone - they must be confirmed by field measurements…
Relevance: among renewable energy sources, wind energy is one of the fastest-developing sectors. Many regions of Uzbekistan are characterized by low and moderate wind speeds, which complicates the extraction of maximum…
Relevance: for industrial enterprises, reducing electricity consumption directly by limiting the operation of major electrical loads is not always permissible, as it may disrupt the technological process and reduce…
Relevance: in this article examines the theoretical foundations of ensuring the balance of electricity in distributed electric networks with a multi-stage polygonal topology developed on the basis of the ENERNET…
Rеlеvаncе: Corona discharge in high-voltage overhead transmission lines causes additional active power and energy losses, increases electromagnetic and acoustic noise, and reduces the overall operational efficiency of…
Relevance: the rational use of energy resources, effective energy consumption management, and improvement of energy efficiency have become key priorities for metallurgical enterprises. The high energy intensity of…
Энергия ва ресурс тежаш муаммолари — barcha maqolalar · 2026-yil arxivi