OPTIMIZATION OF WASTE ROCK PLACEMENT SCHEMES FROM A MINING PERSPECTIVE IN THE DEVELOPMENT OF TITANOMAGNETITE DEPOSITS

Ibrohimov , Dilshodbek

Innovation science and technologiy · 2026-yil

Annotatsiya

This scientific article reviews and analyzes key data on the optimization of waste rock placement schemes inthe open-pit development of the Tebinbulak titanomagnetite deposit. The research assesses the geological structure of thedeposit, examines its mining and technical conditions, calculates the formation patterns of overburden volumes, and explainsexternal, internal, and combined schemes for overburden placement based on practical field studies. According to the practicalresults of the research, the use of a combined dumping system was identified as the most effective method, taking into accountthe geological location and technological characteristics of the Tebinbulak deposit. It has been established that geotechnicalrequirements based on this approach make it possible to reduce transportation distances by using external dumps at the initialstages of mine development and internal dumps at subsequent stages.

Maqola ma’lumotlari
MualliflarIbrohimov , Dilshodbek
JurnalInnovation science and technologiy
Nashr sanasi2026-06-01
Jild2
Son6
Betlar386-393
TilIngliz
DOI10.5281/zenodo.21172634

Kalit so‘zlar

Tebinbulak deposit, titanomagnetite ores, waste rock, overburden, dump, open-pit mining, optimization, geotechnical requirements, mine design, geological modeling

Ilmiy soha

Innovation science and technologiy jurnalidan boshqa maqolalar

Innovation science and technologiy — barcha maqolalar